We are moving along...


BloggerBot

the drywall is up and the first layer of primer. Still waiting for the new windows to arrive.


BloggerBot

The schedule for next weeks should look like this:
* finish up the hot water heat that was moved outside (put up metal enclosure and vent)
* float floor and lay tile
* paint kitchen
* have Lowe's out to remeasure the kitchen and than off to order the cabinets. We already set down with them for the design but we need to remeasure since the plaster is gone and was replaced with drywall.